Abstract
The CMS Tracker Phase-2 Upgrade requires the production of two co-planar strip sensor (2S) modules, and strip and macro-pixel sensor (PS) modules to cope with the requirements of the HL-LHC. Altogether 47520 hybrid circuits are required to construct 8000 2S and 5880 PS modules. The hybrids pre-production phase is now complete. A pre-series batch enabled the identification of different issues that were resolved with the completion of the pre-production. Various issues and solutions are reported.
| Original language | English |
|---|---|
| Article number | C03010 |
| Journal | Journal of Instrumentation |
| Volume | 20 |
| Issue number | 3 |
| Number of pages | 7 |
| ISSN | 1748-0221 |
| DOIs | |
| Publication status | Published - 11. Mar 2025 |
Keywords
- Detector design and construction technologies and materials
- Electronic detector readout concepts (solid-state)
- Front-end electronics for detector readout
- Particle tracking detectors (Solid-state detectors)
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver