Go with the flow: The evolvement of geothermal wellhead maintenance at Hellisheidi power plant

Reynir Smari Atlason, Oli Geirsson, Ari Elisson, Runar Unnthorsson

Research output: Chapter in Book/Report/Conference proceedingArticle in proceedingsResearchpeer-review

Abstract

Iceland relies greatly on geothermal energy, for electricity, district heating and industrial activities. It is therefore of great importance that the maintenance on site is carried out quite successfully to minimize down time. Reykjavik Energy is the largest energy company in Iceland utilizing geothermal energy. The company operates two cogenerating geothermal power plants, Hellisheidi (303 MWe and 133 MWt) and Nesjavellir (120 MWe and 300 MWt). In this study we investigate the development of the wellhead maintenance at the Hellisheidi geothermal power plant. We look at the maintenance recommendations provided to on-site employees and how maintenance procedures have developed since the power plant began its operations. We investigate real data retrospectively and use it to calculate expected waiting times between repairs. The result is a maintenance model based on the observed and statistically analyzed data provided by the power company on the maintenance procedures. Such model should prove of great significance to other geothermal power plants in the early stages of planning the wellhead maintenance.
Original languageEnglish
Title of host publicationASME 2014 Power conference
PublisherAmerican Society of Mechanical Engineers
Publication date2014
Publication statusPublished - 2014
Externally publishedYes

Fingerprint

Dive into the research topics of 'Go with the flow: The evolvement of geothermal wellhead maintenance at Hellisheidi power plant'. Together they form a unique fingerprint.
  • 2014 ASME Power conference

    Reynir Smari Atlason (Participant)

    2014

    Activity: Attending an eventConference organisation or participation

Cite this