Rule based heuristic approach for minimizing total flow time in permutation flow shop scheduling

Balasundaram Rathinam, Kannan Govindan, Baskar Neelakandan, Siva Sankar Raghavan

Publikation: Bidrag til tidsskriftTidsskriftartikelForskningpeer review

OriginalsprogEngelsk
TidsskriftTehnicki vjesnik
Vol/bind22
Udgave nummer1
Sider (fra-til)25-32
DOI
StatusUdgivet - 2015

Citer dette

Rathinam, Balasundaram ; Govindan, Kannan ; Neelakandan, Baskar ; Raghavan, Siva Sankar. / Rule based heuristic approach for minimizing total flow time in permutation flow shop scheduling. I: Tehnicki vjesnik. 2015 ; Bind 22, Nr. 1. s. 25-32.
@article{2fa6513e7b9246139991ee49b3ce633d,
title = "Rule based heuristic approach for minimizing total flow time in permutation flow shop scheduling",
author = "Balasundaram Rathinam and Kannan Govindan and Baskar Neelakandan and Raghavan, {Siva Sankar}",
year = "2015",
doi = "10.17559/TV-20130704132725",
language = "English",
volume = "22",
pages = "25--32",
journal = "Tehnicki vjesnik",
publisher = "Strojarski fakultet u Slavonskom Brodu, Elektrotehnicki fakultet u Osijeku, Gradjevinski fakultet u Osijeku",
number = "1",

}

Rule based heuristic approach for minimizing total flow time in permutation flow shop scheduling. / Rathinam, Balasundaram; Govindan, Kannan; Neelakandan, Baskar; Raghavan, Siva Sankar.

I: Tehnicki vjesnik, Bind 22, Nr. 1, 2015, s. 25-32.

Publikation: Bidrag til tidsskriftTidsskriftartikelForskningpeer review

TY - JOUR

T1 - Rule based heuristic approach for minimizing total flow time in permutation flow shop scheduling

AU - Rathinam, Balasundaram

AU - Govindan, Kannan

AU - Neelakandan, Baskar

AU - Raghavan, Siva Sankar

PY - 2015

Y1 - 2015

U2 - 10.17559/TV-20130704132725

DO - 10.17559/TV-20130704132725

M3 - Journal article

VL - 22

SP - 25

EP - 32

JO - Tehnicki vjesnik

JF - Tehnicki vjesnik

IS - 1

ER -