Hybrids pre-production results for the CMS Outer Tracker Phase-2 Upgrade

  • G. Blanchot*
  • , M. Abbas
  • , I. Ahmed
  • , B. Allongue
  • , D. Andreou
  • , R. Carnesecchi
  • , K. Klein
  • , M. Kovacs
  • , A. Lapornik
  • , A. La Rosa
  • , M. Lipinski
  • , M. Mohammadi Najafabadi
  • , A. Pauls
  • , A. Sultan
  • , P. Szydlik
  • , A. Zografos
  • *Kontaktforfatter
  • CERN
  • RWTH Aachen University

Publikation: Bidrag til tidsskrift › Tidsskriftartikel › Forskning › peer review

10 Downloads (Pure)

Abstract

The CMS Tracker Phase-2 Upgrade requires the production of two co-planar strip sensor (2S) modules, and strip and macro-pixel sensor (PS) modules to cope with the requirements of the HL-LHC. Altogether 47520 hybrid circuits are required to construct 8000 2S and 5880 PS modules. The hybrids pre-production phase is now complete. A pre-series batch enabled the identification of different issues that were resolved with the completion of the pre-production. Various issues and solutions are reported.

OriginalsprogEngelsk
ArtikelnummerC03010
TidsskriftJournal of Instrumentation
Vol/bind20
Udgave nummer3
Antal sider7
ISSN1748-0221
DOI
StatusUdgivet - 11. mar. 2025

Bibliografisk note

Publisher Copyright:
© 2025 The Author(s)

Citationsformater